Parkplanning and PEPC will be offline for Data Center maintenance from 7:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Sleeping Bear Dunes National Lakeshore, Draft General Management Plan/WIlderness Study/Environmental Impact Statement - April 2008


****DUE TO A POWER OUTAGE IN WASHINGTON, D.C. ON THE MORNING OF JUNE 13, 2008, PEPC WAS UNAVAILABLE FOR ABOUT FIVE HOURS. BECAUSE OF THIS, WE ARE EXTENDING THE REVIEW PERIOD THROUGH SUNDAY, JUNE 15, 2008.****


The document examines five alternatives for managing the National Lakeshore for the next 20 or more years. It also analyzes the impacts of implementing each of the alternatives. The noaction alternative reflects current conditions and activities at the Lakeshore. It is provided as a baseline against which to compare the other alternatives and includes 30,903 acres managed to maintain their existing wilderness character. In the preferred alternative, the Lakeshore is valued primarily for preservation of its natural resources, and for the opportunities it provides for visitor enjoyment of the natural, cultural, and recreational resources in a scenic outdoor setting. Lands proposed for wilderness designation include 32,200 acres and no developed county roads. In alternative A, the Lakeshore is valued primarily for conservation of its natural resources. Lands proposed for wilderness designation include 33,600 acres and no developed county roads. In alternative B, the Lakeshore is valued primarily for its recreational opportunities in scenic outdoor settings. Lands proposed for wilderness designation include 14,400 acres and no county roads. In alternative C, the Lakeshore is managed so that most visitor use is concentrated in selected areas, with more natural, primitive conditions promoted in the rest of the Lakeshore. Lands proposed for wilderness designation include 23,200 acres and no developed county roads. The five alternatives are summarized in table 2 (in the
pocket at the end of the document). The key impacts of implementing these alternatives are summarized in table 4 and detailed in chapter 5.
 
Comment Period: Closed        Apr 7, 2008 - Jun 15, 2008
Document Content:
SLBE Draft GMP/EIS - Errata sheetSLBE Draft GMP/EIS - Errata sheet   (16.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.