OSM Seal An Evaluation of Approximate Orginal Contour Variances and Postmining Land Uses in Virginia
Toolbar3.gif

May 1999

A draft report

prepared by the U. S. Department of the Interior,

Office of Surface Mining,

Big Stone Gap Field Office.



C O N T E N T S

EXECUTIVE SUMMARY

1. PURPOSE OF THIS REPORT

2. CONCLUSIONS AND RECOMMENDATIONS

GLOSSARY OF MINING TERMS

State program

Approximate original contour

Types of mining applicable to this report

Mining-related terms

CHAPTER A

1. INTRODUCTION

2. FEDERAL REQUIREMENTS

a. General AOC Requirements

1. Statute

2. Legislative History

3. OSM's Treatment of AOC in Rules

b. Federal Requirements Relating to Mountaintop- Removal Mining Operations

c. Federal Requirements Pertaining to Steep-Slope Mining Operations

4. STATE PROGRAM REQUIREMENTS

a. General AOC Requirements

b. State Requirements Relating to Mountaintop-Removal Mining Operations

c. State Requirements Pertaining to Steep-Slope Mining Operations

5. REVIEW METHODOLOGY

a. Site Selection

b. Work Plan

6. FINDINGS AND ANALYSES

a. Approximate Original Contour (AOC)

b. Mine Classification and Inventory

c. Observed Postmining Land Uses

d. Steep-Slope Mining Operations With AOC Variances

e. Site Reclamation and Utility

7. CONCLUSIONS AND RECOMMENDATIONS

a. Approximate Original Contour (AOC)

b. Mine Classification and Inventory

c. Mountaintop Removal Mining And Steep Slope Operations With AOC Variances

d. Permit Documentation

C H A P T E R B.

EVALUATION REPORTS AND CROSS SECTIONS

A P P E N D I X I

DMME/DMLR - OSM OVERSIGHT WORK PLAN

A P P E N D I X I I

OSM DIRECTIVE INE - 26, APPROXIMATE ORIGINAL CONTOUR

A P P E N D I X I I I

LIST OF ONGOING VIRGINIA MOUNTAINTOP PERMITS AS OF NOVEMBER 1, 1998

A P P E N D I X I V

LIST OF MOUNTAINTOP AND AREA MINING PERMITS USED TO SELECT SITES FOR EVALUATION

A P P E N D I X V

VIRGINIA SURVEY FORM

EXECUTIVE SUMMARY

(See the "Glossary of Mining Terms" for definitions

of the terms used in this document.)

1. PURPOSE OF THIS REPORT

The Office of Surface Mining's (OSM) Big Stone Gap Field Office (BSGFO), in conjunction with the Virginia Department of Mines, Minerals and Energy, Division of Mined Land Reclamation (DMME/DMLR), has prepared this oversight report on portions of the Virginia surface mining program, which was approved on December 15, 1981, under the Federal Surface Mining Control and Reclamation Act of 1977 (SMCRA). The DMME/DMLR, which administers the regulatory program in Virginia, participated in gathering the data for this report and analysis.

This document addresses mountaintop operations, that is, those surface mines that remove all or a large portion of a coal seam or seams running through the upper fraction of a mountain or ridge. Some States in the Appalachian Region report an increase in mountaintop operations in recent years, both in number and scale, which may help explain the upsurge in the public's interest in such mines. As a result of increased public interest in West Virginia and Kentucky, OSM's Appalachian Regional Coordinating Center required all States in the region to include the study as part of their 1999 oversight activities. Upon conclusion of the Appalachian Regional Studies, OSM will determine if regulatory, policy, or procedural changes are needed either nationally or on a state specific basis. BSGFO and DMME/DMLR included mountaintop operations in the general oversight agreement they signed on November 13, 1998, even though very little public concern had been expressed in Virginia.

Many people categorize all mountaintop operations as "mountaintop removal." However, legally speaking, mountaintop removal is only one of three types of mountaintop operations addressed in this report (see glossary for definitions). The three types are: (1) mountaintop removal with a variance from approximate original contour (AOC), (2) mines which remove all of the coal seam or seams in the upper fraction of a mountain but which return the land to AOC, and (3) steep-slope mines with or without an AOC variance. Under SMCRA, as well as both Federal and State regulations, all mines are required to return the mined land to AOC, unless a variance is granted by the regulatory authority. In Virginia, that authority is the DMME/DMLR.

This report focuses on two kinds of issues:

2. CONCLUSIONS AND RECOMMENDATIONS

While mountaintop removal and steep slope mining in Virginia share some of the characteristics of mining practices in the neighboring states of West Virginia and Kentucky, the scale of such operations in Virginia is much smaller. Mountaintop removal sites account for less than one percent of the permits and three percent of the total permitted acreage in Virginia, while permits with variances for steep slope mining account for four and a half percent of the permits and four percent of the total permitted acreage (Charts A-1 and A-2, pages A-15 and A-16). Overall our study found that Virginia is successfully reclaiming mine sites and is limiting the amount of material disposed of in excess spoil fills.

The weaknesses that we found deal with the administration of various aspects of the Virginia program and not with the on-the-ground reclamation. In general, OSM agrees that reforms, as described below, which have been voluntarily initiated by DMME/DMLR to address the weaknesses are appropriate. OSM also believes that these reforms should be applied prospectively, and that existing mining operations, some of which were initially permitted many years ago, should be altered only to the extent practicable. DMME/DMLR has agreed to review all existing permits with variances and apply these reforms prospectively.

Based on an analysis of the information gathered during the oversight process, we developed the following conclusions, actions, and recommendations:

GLOSSARY OF MINING TERMS

OSM has defined the mining terms listed below in an effort to improve the general understanding of mining practices within the State of Virginia. These terms are used throughout this report. OSM has taken some of the definitions from the Virginia Coal Surface Mining Control and Reclamation Act (VCSMCRA), others from the Federal Surface Mining Control and Reclamation Act of 1977 (SMCRA), and others from State (VCSMRR) and/or Federal regulations. Furthermore, OSM has developed some definitions solely for the purpose of the report. When it is not otherwise clear, the source of each definition is identified in the brackets.

State program:

Approved State program.-The Virginia surface coal-mining program approved under SMCRA that consists of the Virginia surface mining law, regulations, policies, and procedures that OSM approved initially on December 15, 1981. Subsequent amendments and actions concerning the approved State program are set forth in 30 C.F.R.

Oversight.-The term describes OSM's monitoring of a State's implementation of its approved program. [General term described in 30 C.F.R. Part 732.]

Primacy.-The term used to describe the delegation of primary authority by OSM to a State in administering its surface mining program. Virginia obtained primacy on December 15, 1981, with OSM's conditional approval of its permanent regulatory program. [General term described in 30 C.F.R. Part 732.]

Approximate original contour (AOC):

AOC.-The surface configuration achieved by backfilling and grading of the mined area so that the reclaimed area, including any terracing or access roads, closely resembles the general surface configuration of the land prior to mining and blends into and complements the drainage pattern of the surrounding terrain, with all highwalls and spoil piles eliminated. All mined areas are to be returned to AOC unless they receive a variance. [Term defined in section 4 VAC-25-130-700.5 of VCSMRR and subsection 701(2) of SMCRA.]

AOC variance.-A regulatory authority may grant a variance or waiver from the requirement to restore a site to AOC if certain specified conditions are satisfied. State and Federal law provide for the following types of AOC variances: mountaintop removal, steep-slope, thick overburden, thin overburden, and remined areas. This report concentrates only on mountaintop removal and steep-slope AOC variances.

A mountaintop removal variance can be granted by the regulatory authority only if the entire coal seam or seams running through the upper fraction of the hill, ridge, or mountain is removed, and a level plateau or a gently rolling contour is created with no highwalls remaining. The site granted such a variance must be capable of supporting certain postmining land uses.

A steep-slope AOC variance may be granted by the regulatory authority if (1) the proposed mining is going to occur in a steep-slope area, (2) the watershed control of the area will be improved by granting such a variance, and (3) the landowner requests in writing that the variance be granted in order that the land after reclamation will be suitable for an industrial, commercial, residential, or public postmining land use (including recreational facilities). [Section 4 VAC-25-130-785.16 of the VCSMRR and subsections 515(c) and (e) of SMCRA]

Types of mining applicable to this report:

Area mining.- A mining operation where, unless the operation is located in a steep-slope area and a steep-slope AOC variance has been granted, all disturbed areas are restored to (1) AOC and (2) the site is capable of supporting the uses that existed prior to mining or an equal or better use.

An area-mining operation may remove multiple seams of coal in the upper reaches of a mountain just like a mountaintop removal operation; however, this type of operation cannot be classified as a mountaintop removal operation for two reasons. First, the site may be restored to AOC; second, the entire coal seam or seams may not be removed. [Section 4 VAC 25-130-700.5 of the VCSMRR and OSM/DMME/DMLR oversight work plan; definition modified for use in this report]

Contour mining.- Surface-mining technique that makes a cut into a hillside, creating a level bench with a highwall. A contour-mined area must be restored to AOC, including elimination of the highwall, unless the mining is conducted on a steep slope and a variance from AOC has been approved. In either situation, the highwall must be eliminated. The AOC variance would have to meet the requirements of a steep-slope variance.

Mountaintop operations.- Is a generic term used by the industry and public to describe the type of surface mining that removes all or a large portion of a coal seam or seams running through the upper fraction of a mountain or ridge. In common usage it includes: (1) mountaintop removal with a variance from AOC, (2) mines which remove all of the coal seam or seams in the upper fraction of a mountain but which return the land to AOC, and (3) steep-slope mines with or without an AOC variance.

Mountaintop removal operation.- Type of surface-mining operation that (1) has been granted a variance from AOC and (2) extracts an entire coal seam or seams running through the upper fraction of a mountain, ridge, or hill. Coal extraction must be accomplished by removing all of the overburden and creating a level plateau or a gently rolling contour that both has no highwalls remaining and is capable of supporting certain postmining land uses. The allowable postmining land uses for mountaintop removal operations are industrial, commercial, woodland, agricultural, residential, or public facility (including recreational facilities) use. [Section 4 VAC 25-130-785.14 of the VCSMRR and Subsection 515(c) of SMCRA]

Steep-slope mining. -Type of surface-mining operation where the natural slope of the land within the proposed permit area exceeds an average of 20 degrees. In Virginia, those portions of a permit area classified as "steep slope" may obtain a variance from AOC if the permit application demonstrates that (1) the postmining use of the mined land will be equal to or better than its premining use, (2) the watershed affected by mining will be improved, and (3) mining will comply with all applicable provisions of the approved State program. Such operations could qualify as area, contour, or mountaintop mines, as further defined in this glossary. [Section 4 VAC 25-130-785.16 of the VCSMRR and 30 C.F.R. section 785.16]

Mining-related terms:

Durable rock.-Naturally formed aggregates that will not slake in water or degrade to soil material. State and Federal law provide that durable-rock fills must consist of at least 80 percent durable rock. [Sections 4 VAC 25-130-816.73 and 817.73 of the VCSMRR and 30 C.F.R. sections 816 and 817.73]

Excess spoil. -Overburden material that is disposed of in a location other than the mine pit and that is not needed to achieve AOC. [Section 4 VAC 25-130-700.5 of the VCSMRR and 30 C.F.R. section 701.5]

Excess-spoil fills. -Fill structures that are created by the placement of excess spoil in valleys, on hillsides, or on preexisting benches. The State program contains regulations for constructing valley or head-of-hollow, preexisting bench, and durable-rock fills. Although most excess-spoil fills are commonly referred to as valley fills, most mountaintop removal and steep-slope mining operations today involve the construction of durable-rock fills. [Sections 4 VAC 25-130-816.71 and 817.71 of the VCSMRR and 30 C.F.R. sections 816 and 817.71]

Overburden. -Consolidated or unconsolidated material of any type, excluding topsoil, which overlies a mineral deposit. [Section 4 VAC 25-130-700.5 of the VCSMRR]

Premining/postmining land use.-The primary uses of the land before and after mining. After mining, land is generally required to be returned to its premining use. As provided by section 4 VAC 25-130-816.133 and section 817.133 of the VCSMRR a site may be returned to an alternative postmining land use if certain requirements are satisfied. Permits involving mountaintop removal or steep-slope mining operations with variances from AOC may be issued by the regulatory authority only if they meet certain specified postmining land use requirements as described in the approved State program. [ Section 4 VAC 25-130-700.5]

Relief.-Difference in elevation between the highest mountaintop, ridge, or hill and the lowest valley within a permit area. [Derived, for purposes of this report, from Bureau of Mines, Dictionary of Mining, Mineral, and Related Terms: U.S. Government Printing Office, 1968.]

Required findings.-Specific findings that a regulatory authority must make prior to granting a mountaintop removal permit or steep-slope AOC variance. [Section 4 VAC 25-130-785.14 (c) and subsections 515(c) and (e) of SMCRA]

Steep slope.-Any slope of more than 20 degrees or such lesser slope as may be designated by the regulatory authority after consideration of soil, climate, and other characteristics of a region or state. [Section 4 VAC 25-130-701.5 and 30 C.F.R. section 701.5]

Swell.-The tendency of soils, on being removed from their natural, compacted beds, to increase or swell owing to the creation of voids or spaces between soil particles. The volumetric increase, normally expressed as a percentage, that occurs as the consequence of changing undisturbed overburden (bank) into loose (excavated) material. [Derived, for purposes of this report, from Bureau of Mines, Dictionary of Mining, Mineral, and Related Terms: U.S. Government Printing Office, 1968.]

CHAPTER A.

AN EVALUATION OF APPROXIMATE

ORIGINAL CONTOUR AND POSTMINING

LAND USE IN VIRGINIA

1. INTRODUCTION

The Federal Surface Mining Control and Reclamation Act of 1977 (SMCRA) establishes a program of cooperative federalism that allows states such as Virginia to enact and administer their own regulatory programs within limits established by Federal minimum standards, with oversight authority vested in the Department of the Interior. See H.R. Rep. 218, 95th Cong., 1st Sess. at 57 (1977), reprinted in 1977 U.S. Code Cong. & Admin. News 593, 595; Hodel v. Virginia Surface Mining and Reclamation Association, 452 U.S. 264, 289 (1981). In SMCRA's findings section, Congress provides the following explanation for its decision to offer each state "primary jurisdiction," or "primacy," in this area:

because of the diversity in terrain, climate, biologic, chemical and other physical conditions in areas subject to mining operations, the primary governmental responsibility for developing, authorizing, issuing, and enforcing regulations for surface mining and reclamation operations subject to this chapter should rest with the States[.]

30 U.S.C. § 1201(f).

Primacy does not, however, grant a state absolute authority to regulate surface coal mining without any Federal involvement. Section 503 of SMCRA requires that state rules and regulations be "consistent with regulations issued by the Secretary pursuant to [SMCRA]."

30 U.S.C. § 1253(a)(7). Further, Section 505(b) of SMCRA provides that "[a]ny provision of any State law or regulation . . . which provides for more stringent land use and environmental controls and regulations" than does SMCRA or the Federal rules "shall not be construed to be inconsistent" with SMCRA. 30 U.S.C. § 1255(b).

Because Virginia has a state program approved under Section 503 of SMCRA, see 30 C.F.R. Part 946, its actions must be evaluated for consistency with that program. At the same time, however, if it becomes apparent that some aspect of the approved program is inconsistent with SMCRA, it is incumbent upon the Office of Surface Mining (OSM) to address that situation. If, for example, State program provisions are found to be less effective than the Federal requirements, OSM can require the State to amend its program in accordance with 30 C.F.R. § 732.17. In this report, OSM has evaluated the way in which the Virginia Department of Mines, Minerals and Energy, Division of Mined Land Reclamation (DMME/DMLR) administers the requirements relating to approximate original contour (AOC) and postmining land uses associated with mountaintop removal and steep-slope AOC variances for consistency with its approved State program. OSM has also reviewed the State program requirements to determine if they are consistent with Federal requirements.

This report focuses on two issues:

In order to evaluate DMME/DMLR's administration of requirements related to AOC and postmining land use and to determine whether Virginia requirements are consistent with SMCRA, the team reviewed 10 permits, 7 of which had AOC variances. The team focused its evaluation on (1) gathering data that might be useful in understanding how AOC is determined in Virginia and determining whether or not DMME/DMLR should modify its method for determining AOC, and (2) determining the appropriateness of the postmining land use when an AOC variance was granted by the State. Some permits involved disturbances initiated early in the permanent program; others involved recent disturbances. The purpose of evaluating older permits was to gain insight into the actual forms of land created after mining and to see if any trends have been established over the years.

In order to review land configuration after reclamation and to evaluate the amount of success in establishing, and the appropriateness of, postmining land uses, the review included examination of two permits in which the bonds have already been released. The team also examined the database the State uses to catalogue mining operations in order to see if it could be used to accurately identify the number of operations fitting the parameters of this study.

2. FEDERAL REQUIREMENTS

a. General AOC Requirements

1. Statute

Section 701(2) of SMCRA defines "approximate original contour" to mean

that surface configuration achieved by backfilling and grading of the mined area so that the reclaimed area, including any terracing or access roads, closely resembles the general surface configuration of the land prior to mining and blends into and complements the drainage pattern of the surrounding terrain, with all highwalls and spoil piles eliminated; water impoundments may be permitted where the regulatory authority determines that they are in compliance with Section 515(b)(8) of this Act.

30 U.S.C. § 1291(2).

Section 515 of SMCRA sets forth environmental protection performance standards applicable to surface coal mining operations. 30 U.S.C. § 1265. Among these standards is the requirement to return the land to AOC--pursuant to Subsection 515(b)(3), mine operators must "backfill, compact . . ., and grade in order to restore the approximate original contour of the land with all highwalls, spoil piles, and depressions eliminated." 30 U.S.C. § 1265(b)(3).

2. Legislative History

The legislative history of SMCRA shows that Congress intended to provide considerable flexibility with respect to what surface configuration would satisfy the statutory requirement for AOC restoration. The Committee Report on the House version of SMCRA, which contained the definition of AOC that was enacted into law, stated:

H.R. 2 requires that a mine site be regraded to AOC. Moreover, the regrading standard of H.R. 2 was formulated to cover all types of mining operations under all conditions. Thus it is, of necessity, a flexible standard which contemplates different mining circumstances. The bill's critics have alleged, to the contrary, that the term "approximate original contour" imposes an overly rigid and impractical requirement. It should be emphasized, therefore, that a reasonable interpretation of H.R. 2 cannot justify the assertion that the bill requires either the impossible task of restoration of the original contour or the useless act of digging a pit to obtain fill material to achieve full restoration of the original topography.

H.R. Rep. No. 95-218, at 96 (1977).

Since the enactment of SMCRA, OSM has recognized that, in primacy States, the State regulatory authority has the primary responsibility for interpreting what constitutes AOC at a given mine site during the permitting process. See 30 U.S.C. § 1201(f), quoted supra in the Introduction.

An important AOC issue, however, is the extent to which a postmining change in land elevation, slope, relief, or configuration constitutes a departure from AOC. Our research into SMCRA's legislative history has indicated that the primary element of AOC is configuration or shape. Although the House Committee Report mentioned both configuration and elevation, it gave primary emphasis to configuration:

As defined in the bill, approximate original contour means:

That surface configuration achieved by backfilling and grading of the mine area so that the reclaimed area, including any terracing or access roads, closely resembles the general surface configuration of the land prior to mining and blends into and complements the draining pattern of the surrounding terrain, with all highwalls and spoil piles eliminated * * *.

The term contour is defined by the dictionary as "the outline of a figure or body, with a line or lines representing such an outline." The contour of ground is similarly defined as the outline of the surface of the ground with respect to its undulations. These two definitions primarily refer to the shape or configuration of a surface. In addition, with respect to mapping, contour takes on an additional meaning; the imaginary line connecting the points on the land surface that have the same elevation and the line representing such line on a map or chart. In order to understand this concept it is necessary to distinguish between the two dimensions of elevation and configuration.

Id. at 97.

The Committee went on to give a number of examples of what the Committee meant by AOC. Id. at 97-103. In each of these, the emphasis was on configuration as the primary element.(1)

Our examination of the legislative history of SMCRA has disclosed no statements indicating that a change in elevation, by itself, constitutes a departure from AOC. Instead, on several occasions during the debate on SMCRA and its precursors, the bill's sponsors gave assurances that the AOC requirement did not mandate a return to original elevation. Usually, these statements were made in response to charges that a return to AOC, as required by SMCRA, would be impossible. For example, during the floor debate on H.R. 25, a direct precursor of SMCRA, Representative Clausen of California, one of the principal sponsors of the bill, emphasized that AOC did not mandate a return to original elevation:

In addition, the bill requires that lands be returned to the approximate original contour and requires they be covered by vegetation. The land must come as close to resembling its premining appearance as possible. It is important to point out that this requirement is not intended to require restoration of mined lands to their original elevation, but to a similar configuration.

121 Cong. Rec. 6676, 6686 (March 14, 1975)(floor debate on H.R. 25) (emphasis added).

During the same debate, Congressman Ruppe of Michigan, who played a key role in SMCRA's enactment, also emphasized that it did not mandate a return to original elevation:

However, we plainly realize that the lands which will be mined vary in terms of their physical characteristics, and as a result we have provided rational flexibility. We do not mandate that the mined land be returned to exactly the same shape as it was prior to mining. What the committee has obliged operators to do is to return the land to its "approximate original contour." It should be emphasized here once again, as I have attempted to do many times in the past, that "approximate original contour" does not mean that the land must be returned to original elevation. This would be patently ridiculous in the case of a thick seam of coal covered by a relatively thin stratum of overburden. When this coal is mined, it will create a depression that could not be returned to the original elevation without hauling an enormous amount of materials from some other location, thereby creating a similar depression elsewhere. Therefore, the committee bill requires that the coal operator regrade the mined area inside and around the perimeter of the mined area so that the depression blends into the surrounding terrain, and that within the mined area, the surface of the land "closely resembles" its premining configuration.

Id. at 6888. See also Additional Views of Cong. Ruppe, Clausen, and Lagomarsino, H.R. Rep. No. 94-45, at 152 (94th Congress, 1st Sess. 1975) ("First, approximate original contour as it applies to thick seam area mining in the West is not intended to require that the mined site be returned to its original elevation. Original elevation simply often cannot be obtained. . . . It must be emphasized that the requirement to return to approximate original contour does not necessarily mandate the attainment of original elevation."); 120 Cong. Rec. 23650, 23659 (July 17, 1974) (floor debate on H.R. 11500, another SMCRA precursor); ("Now approximate original contour does not mean original elevation or that every bump on the landscape must be restored.").

While this legislative history is helpful, much of it focuses on thin and thick overburden situations, rather than mountaintop removal and steep-slope mining operations, and it does not clearly state what a regulatory authority must consider when making AOC determinations. Subsection 515(b)(3) of SMCRA specifically exempts thin and thick overburden situations from the requirement to restore the AOC.

3. OSM's Treatment of AOC in Rules

In its national regulations and in approving individual State programs, OSM adopted the statutory definition of AOC essentially unchanged. In the development of national regulations, the only discussion of elevation change in relation to AOC is in the preamble to the rules regarding thick or thin overburden. The permanent program rules promulgated in 1979 defined thin overburden as overburden where the final thickness is less than 0.8 times the initial thickness and thick overburden as overburden where the final thickness is greater than 1.2 times the initial thickness. The preamble stated:

The definition of approximate original contour states that the reclaimed area should closely resemble the general surface configuration of the land prior to mining. OSM interprets this to mean that the approximate original contour, or configuration, of the premining land is intended, and minor changes in elevation are anticipated.

44 Fed. Reg. 15231 (March 13, 1979).

Thus, an elevation change of plus or minus 20 percent was accepted as AOC in those rules.

In 1983, those numerical limits were deleted from the thick and thin overburden rules. See 48 Fed. Reg. 23356, 23365 (May 24, 1983). In 1988, the D.C. Circuit upheld the remand of those rule changes because the Secretary had failed to explain his reasons for removing the numerical limits. National Wildlife Federation v. Hodel, 839 F.2d 694, 734 (D.C. Cir. 1988). In 1991, OSM again published rules addressing thick and thin overburden. The preamble contains cross sections showing elevation changes of greater than plus or minus 20 percent that would still be considered AOC. With this rule OSM declined to set a numerical limit and asserted that the issue was best left to the state regulatory authority. See 56 Fed. Reg. 65629-95633 (December 17, 1991).

In 1987, OSM issued Directive INE-26 (see Appendix II) to provide guidance to OSM field personnel in evaluating AOC issues during oversight. The Directive makes three points with respect to AOC. First, because both the permittee and the regulatory authority (as well as other interested parties) need a clear understanding prior to mining of what the final postmining topography will be, the anticipated postmining topography must be determined in the permitting process to enable a determination of whether AOC will be achieved. Second, inspections should ensure that the approved postmining topography is being reasonably achieved, including general surface configuration, drainage, and elimination of highwalls and spoil piles. Third, in oversight, considerable deference should be given to prior decisions by the State, particularly where the final grade work has been done. In recognition of the emphasis that the 1987 Directive places on the role of the permitting process in applying AOC requirements to specific operations, the current review looked to see what DMME/DMLR was accepting as meeting AOC requirements in the permitting process. (See page A-18 for further discussion of the findings.)

b. Federal Requirements Relating to Mountaintop-

Removal Mining Operations

Section 515 of SMCRA contains specific performance standards for mountaintop removal mining. Subsection 515(c) permits an exception to the AOC restoration requirement for mountaintop removal operations which, after reclamation, would be capable of supporting specific postmining land uses. In such operations, instead of restoring the site to approximate original contour, the operator removes the entire coal seam or seams running through the upper fraction of a mountain, ridge, or hill, by removing all of the overburden and creating a level plateau or a gently rolling contour with no highwalls remaining. 30 U.S.C. § 1265(c). Subsection 515(c)(3) lists the allowable postmining land uses: "industrial, commercial, agricultural, residential or public facility (including recreational facilities) use[s]." 30 U.S.C. § 1265(c)(3). In demonstrating the feasibility and practicability of the proposed postmining land use, the applicant must include specific plans and show that the use will be:

( i) compatible with adjacent land uses;

(ii) obtainable according to data regarding expected need and market;

(iii) assured of investment in necessary public facilities;

(iv) supported by commitments from public agencies where appropriate;

(v) practicable with respect to private financial capability for completion of the proposed use;

(vi) planned pursuant to a schedule attached to the reclamation plan so as to integrate the mining operation and reclamation with the postmining land use; and

(vii) designed by a registered engineer in conformance with professional standards established to assure the stability, drainage, and configuration necessary for the intended use of the site.

30 U.S.C. § 1265(c)(3)(B).

Federal regulations pertaining to mountaintop removal operations are found at 30 C.F.R.

§ 785.14 and Part 824. The regulations generally track the language of SMCRA, but do clarify the applicable requirements in the following respects:

§ 824.11(a)(9)].

c. Federal Requirements Pertaining to Steep-Slope Mining Operations

Subsection 515(d) of SMCRA specifies additional requirements for "steep-slope surface coal mining." The term "steep slope" is defined at Subsection 515(d)(4) as "any slope above twenty degrees or such lesser slope as may be defined by the regulatory authority after consideration of soil, climate, and other characteristics of a region or State." 30 U.S.C. § 1265(d)(4). When mining on such slopes, the operator may not place spoil, abandoned or disabled equipment, debris or waste materials downslope below the bench or mining cut; the operator may not disturb the land above the top of the highwall unless it is found that such disturbance will facilitate compliance with the Act's environmental protection standards; and the operator must completely backfill with spoil material to "cover completely the highwall and return the site to approximate original contour . . ." 30 U.S.C. § 1265(d).

As provided in Subsections 515(e)(1) and (e)(2) of SMCRA, a variance from AOC for a steep-slope mining operation is allowed if the owner of the property requests it in writing as part of the permit application; the watershed control of the area is improved; the potential use of the affected land is deemed to constitute an "equal or better economic or public use;" and the proposed use is designed and certified by a qualified registered professional engineer in conformance with professional standards established to assure the stability, drainage, and configuration necessary for the intended use of the site. 30 U.S.C. § 1265(e)(1) and (e)(2). Subsection 515(e)(2) further specifies that these variances from AOC must be for operations that will render the land suitable, after reclamation, "for an industrial, commercial, residential or public use (including recreation facilities)." 30 U.S.C. § 1265(e)(2).

The Federal regulations relating to steep-slope mining operations are found at 30 C.F.R.

§§ 785.15, 785.16, 816.107/817.107, and 816.133(d)/817.133(d). The regulations generally track the language of SMCRA, but do clarify the applicable requirements for steep-slope mining operations receiving a variance from AOC requirements:

4. STATE PROGRAM REQUIREMENTS

a. General AOC Requirements

Virginia law requires, with certain exceptions, that mined lands be returned to AOC. Subsection 45.1-229 of the Virginia Coal Surface Mining Control and Reclamation Act (VCSMCRA) essentially repeats the SMCRA definition of AOC. The exceptions, i.e., formal variances from AOC, are addressed in Subsection 45.1-242(C) of the VCSMCRA. Table A-1 contains a summary of the State's requirements relating to AOC and the variances that are allowed under the Virginia approved program.

During the permitting process, applicants must identify the premining and postmining topography and indicate whether they are requesting a variance from AOC. Depending on the mining plan, operators in steep-slope areas (greater than 20 degrees) can obtain either a permit for mountaintop removal mining, or a permit containing a steep-slope AOC variance.

b. State Requirements Relating to Mountaintop-Removal Mining Operations

Subsection 4 VAC 25-130-785.14 of the Virginia Coal Surface Mining Reclamation Regulations (VCSMRR) provides that an AOC variance may be granted for the surface mining of coal, "where the mining operation will remove the entire coal seam or seams running through the upper fraction of a mountain, ridge, or hill . . . by removing all of the overburden and creating a level plateau or a gently rolling contour with no highwalls remaining and capable of supporting [certain] postmining uses . . ." (emphasis added).

TABLE A-1

Virginia PROVISIONS Approximate Original Contour (AOC) Restoration Mountaintop Removal AOC Variance Steep Slope AOC Variance
Premining topographical eligibility requirements None.

Standard applies universally in absence of variance.

Mountain, ridge, or hill Average slopes in excess of 20 degrees

Postmining topographical requirements Must closely resemble general premining surface configuration Level or gently rolling inward-draining plateau No specific requirements (dependent upon land use and terrain)
Surface owner consent to proposed postmining topography Not required, but owner must be consulted on postmining land use Not required, but owner must be consulted on postmining land use Required
Acceptable postmining land uses Premining or higher or better uses (uses with higher economic value or nonmonetary benefit to landowner or community) Industrial, commercial, agricultural, residential, or public use (including recreational facilities) Industrial, commercial, residential, or public use (including recreational facilities)
Implementation requirements for approved postmining land use None (must be capable of supporting approved use) Integrated with mining None (must be capable of supporting approved use)
Special hydrologic requirements None Must not damage natural watercourses Must demonstrate that watershed will be improved
Required static safety factor 1.3 1.5 1.3
Amount of overburden that may be placed outside mined-out area Limited to excess spoil and spoil required for blending with surrounding terrain No restrictions apart from requirement to retain enough on bench to achieve postmining land use Limited to amount necessary to achieve postmining land use and ensure stability
VCSMRR 4 VAC 25-130-816/817.102,104,105 4 VAC 25-130-785.14; 824.11; 816.133 4 VAC 25-130-785.15,16; 816/817.107,133

As illustrated in table A-2, the allowable postmining land uses for mountaintop removal operations approved under the Virginia program include:

• industrial,

• commercial,

• agricultural,

• residential, or

• public facility (including recreational facilities.)

TABLE A-2

Approvable Postmining

Land Uses in Virginia

Mining Type

A
B
C
D
E
F
G
Mines w/o AOC Variance

X

X
Steep-Slope Mines w/AOC Variance*
X X X X
Mountaintop Removal Mines*
X
X
X
X
X
A. Premining Use

B. Equal or Better Economic or Public Use

C. Industrial

D. Commercial

*Must also constitute an equal or better use

E. Agricultural

F. Residential

G. Public Use

Pursuant to § 4 VAC 130-785.14(c) of the VCSMCRR, the State may grant a permit with a mountaintop removal mining variance only after finding the following:

c. State Requirements Pertaining to Steep-Slope Mining Operations

Subsections 4 VAC 25-130-785.15 and 16, and 4 VAC 25-130-816/817.107 of the VCSMCRR contain requirements governing steep-slope mining. The term "steep slope" is defined at § 4 VAC 25-130-700.5 as "any slope of more than 20 degrees or such lesser slope as may be designated by the division after consideration of soil, climate, and other characteristics of a region or State." When mining on such slopes, no spoil, abandoned or disabled equipment, debris or waste materials may be placed on the downslope; the operator may not disturb the land above the top of the highwall unless it finds that such disturbance will facilitate compliance with the environmental protection standards of the subchapter; and woody materials may not be placed in the backfill unless it will not affect stability of the backfill. Virginia's program also requires that highwalls be eliminated and the site be returned to AOC unless a variance is granted, or previously mined lands are involved and insufficient spoil exists to return the site to AOC.

State regulations at § 4 VAC 25-130-785.16 provides that DMME/DMLR may issue a permit with a variance from AOC for surface mining on slopes greater than 20 degrees when the watershed of the area is improved and all backfilling and grading is completed with all highwalls eliminated. The State may grant a variance from the requirements for restoring mined lands in steep-slope areas to AOC only if:

proposed alternative postmining land use.

5. REVIEW METHODOLOGY

Beginning in 1997, the public and media began to focus increasing attention on "mountaintop removal operations" in West Virginia and Kentucky. Commonly understood, the term "mountaintop removal" refers to any operation that removes all or part of the top of a mountain or ridge and places the overburden or excess spoil resulting from the removal into fills. This common usage can lead to confusion because, as defined in SMCRA, the term "mountaintop removal" refers only to one specific type of mining operations conducted in mountainous areas. This report will use the broader term "mountaintop operations" to refer generally to mining operations that remove all or part of a mountain or ridge. This report will use the narrower term "mountaintop removal (AOC variance) operations" in its legal SMCRA sense (see category #1 below).

Three types of mining practices are included in the term "mountaintop operations" for this evaluation. These types are:

Mines (area mines) which remove all of the coal seam or seams in the upper fraction of a mountain or ridge and return the land to AOC.

For ease of reading we will refer to all mountaintop removal mining with an AOC variance as mountaintop removal operations and similar sites without an AOC variance as area mines. For the remainder of this report, steep slope mining identifies sites in topography with slopes greater than 20 degrees which may or may not have an AOC variance and the term will be used with other descriptive terms (e.g., steep slope mines with/without an AOC variance).

Notwithstanding regulatory definitions, OSM recognizes that the public's concern in other states is not confined to any one of these mining scenarios, but encompasses all three. Accordingly, this report addresses all three types of mines.

Chart A-1(Page 15) shows the number and types of mining operations currently occurring in Virginia. Chart A-2 (Page 16) shows the current permitted acreage by mining and/or variance type. Comparatively these charts show the number of ongoing mountaintop removal (6); surface mines with steep slope AOC variances (5); underground mines with steep slope AOC variance (22); and other steep slope AOC variance mining operations (5), such as preparation plants and fill areas, in relation to all mining operations (681). As can be seen from these charts mountaintop removal operations account for less than one percent of all mining and three percent of the permitted acreage. Steep slope mining sites with AOC variances account for four and a half percent of all mining permits and four percent of the total permitted acreage. Because most variance areas do not encompass the entire permit, our study found that the variances applied on average to about half of the individual permit or about four percent of the all of the permitted acreage in Virginia.

a. Site Selection

OSM and DMME/DMLR established a team to conduct this evaluation. OSM team members reviewed a list of sites provided by DMME/DMLR and selected a sample. Appendix IV contains a copy of the State listings from which the selections were made. The team selected ten site from the following categories in order to evaluate the three types of mining practices mentioned above:

Table A-4 ( Page A-21) lists the sites selected for review by permit number and mining category.

b. Work Plan

The team members conducted both permit reviews and field investigations. The team also analyzed the statistics and prepared this report.

In evaluating operations which had been granted mountaintop removal or steep slope AOC variances, the team reviewed permit documents to determine whether or not permit applicants had satisfied all State program requirements relating to mountaintop removal or AOC-variance approvals, and postmining land use changes. In evaluating operations where the site was to be returned to AOC, the team reviewed permit files to determine how the approved mining maps and plans documented compliance with State AOC variance provisions and, if applicable, with alternative postmining land use requirements.

The team conducted field investigations on all active sites selected for this study. Because our right of entry authority expires with the termination of jurisdiction at bond release, we did not conduct on-site field inspection on the two bond released sites. Each permit was examined to determine whether the final surface configuration of the permit area was consistent with the approved permit and whether or not its (alternative) postmining land use was in development or had been achieved according to the plans and schedule required by the approved State program. In addition to the inspection criteria listed above, field investigations sought to ascertain which site conditions DMME/DMLR generally views as constituting "AOC." Review team members photographed each site to illustrate current conditions. The team obtained a representative cross section of premining land configuration from each permit package and a postmining land configuration was determined using a global positioning system (GPS) survey. Chapter B of this report shows both the cross sections and the photographs the review team compiled for seven of the ten sites.

In general, the review team gathered descriptive information to assess how the State has been implementing the AOC restoration requirement. This information included:

This information was used to document the conditions that the Virginia regulatory authority regards as constituting postmining AOC and to evaluate differences, if any, between the final configuration of sites with AOC variances and those without AOC variances. Appendix I contains a copy of the performance agreement between DMME/DMLR and OSM. Appendix V contains a copy of the evaluation form used by the team.

6. FINDINGS AND ANALYSES

a. Approximate Original Contour (AOC)

In order to facilitate a more comprehensive understanding of State implementation of the AOC requirement, the team gathered information beyond what might normally be collected by OSM in reviewing State AOC decisions. For example, rather than only verifying that the State followed a reasonable process in making its determination and that the on-the-ground reclamation conformed to the permit, the team developed its own descriptions of the site including cross sections, photographs, etc. to facilitate an overall understanding of what is considered as AOC within the State. Tables A-4 and A-5, pages A-21 and A-23 respectively, as well as Chapter B of this report, provide descriptive information about all the sites evaluated.

Excavated material swells because of the creation of voids during mining. The swell factor is one of the elements considered in estimating the number and size of fills needed to conduct an operation. Table A-5 shows that not all of the permit applications that were reviewed contained information regarding swell factors and the amount of predicted excess spoil to be placed in fills. While there is no specific numerical requirement in the regulations relating to swell factor, the permit applications should contain information regarding spoil calculations and the amount of excess spoil to be placed in fills. This information may be a good indicator of the degree to which an operation proposes to use available material to reach AOC.

To evaluate how DMME/DMLR is making AOC determinations, the team compared operations that return(ed) the land to AOC to those granted variances from AOC. The team made the following observations:

K E Y T O C O L U M N S I N T A B L E A - 4

Selected Sites-- Permit numbers for sites in the evaluation.

Entire Coal Seam Removed Y/N--This column indicates if the mining operation removed at least one entire coal seam in the upper fraction of a mountain, ridge, or hill. A multiple seam operation would not have to remove all seams being mined to receive a Yes (Y) in this column.

Stated Mining Type--This column lists the mining types found in the permit application. Note from the next column that mountaintop (mtntop) does not always include a waiver indicating an AOC variance was requested making it a mountaintop removal in the regulatory sense.

Requested AOC Variance Type--

SS--The permit was approved with a steep-slope AOC variance.

MTN--The permit was approved with a mountaintop removal variance.

N--No variance was approved. The site is to be returned to AOC.

Premining Land Use--Existing land use as described in the permit.

Postmining Land Use-- Land use to be attained after mining according to the permit.

Largest Elevation Change--The team calculated elevation change by comparing the current elevations, obtained from Global Positioning System (GPS) technology, of graded and disturbed areas with the premining contours obtained from the permit application. Representative cross-sections of current conditions were field located as close as possible to the cross-sections contained in the original permits. See Chapter B for cross sections and photographs. Each measurement was recorded as a negative or positive gain and then averaged accordingly.

Average Elevation Change-This is the average gain or reduction in elevation taken from representative cross-sections developed from premining contours and a field survey of disturbed and graded areas using GPS technology. Measurements were taken as follows:

Scale 1"=50' - every 25' Scale 1"=200" - every 100' Scale 1"=400' - every 200'.

Each measurement was recorded as a negative or positive gain and then averaged accordingly.

Run-Off Direction--This column indicates whether there was a major redirection of run-off from or drainage to another watershed caused by a change in contours from premining to postmining.

TABLE A-4

Characteristics of Sites Selected for Review

Selected Sites

Entire coal seam removed

Y/N

Stated Mining Type

Requested AOC Variance (Type)

Premining

Land Uses

Postmining Land Uses

Largest Elevation

Change

feet

Ave. Elev. Change

feet

Run-off Pattern Changed (Y/N)

Y/N SS/MTN
1100321 Y Mtntop

Y

MTN Forestland Agricultural -140** -95** N
1101115 N Contour

Y

SS Forestland/

previously mined land]

Agricultural -80 -45 N
1101308 Y Mtntop/Contour/Auger

Y

MTN Forestland/

/previously mined land

Agricultural -50** -8** N
1101352 Y Mtntop/Contour/Auger

Y

MTN Forestland/

Agriculture/

Previously mined land

Forest/Agricultural -110 35 N
1101521 N Contour & auger

N

Forestland Forestland /Industrial -50 -16 N
1101548 Y Area/Mtntop/Contour

N

Forestland/

previously mined land

Forestland -140 -45 N
1101556 Y Mtntop/

Contour/

Auger

Y

MTN Forestland/

previously mined land

Fish & Wildlife N/A* NA* N
1101602 Y Mtntop

Y

MTN Agricultural/

Forestland

Agricultural -100 -52 N
1201133 N Underground

Y

SS Forestland Industrial 20 8 N
1601519 Y Area

N

Forestland/

Previously mined land

Agriculture/ Forestland -60 -32 N

* Variance area was never mined

** Data taken from the permit package for these permits. GPS data not available for these sites.

K E Y T O C O L U M N S I N T A B L E A - 5

Selected Sites-- Permit numbers for sites in the evaluation listed in chronologically according to the date of the original application, with the last two digits representing the year received.

Permit Size--The size in acres of the area covered by the listed permit.

AOC Variance Y/N--This column indicates if the permit as issued included a variance from the requirement to reclaim to AOC. A (Y) in this column means the permit was approved with either a mountaintop removal or steep-slope AOC variance.

Premining Overburden-This is the volume, in million cubic yards, of materials overlying the coal seam(s) prior to mining. This volume includes the volume of materials between coal seams for multiple-seam operations. Unless noted, the volume is "in-place" volume, not for broken or loose material.

Predicted Swell--This column lists the predicted increase in the volume of material resulting from the breakage or loosening of the overburden, in percentage and volume terms. The "swell" of material is a function of the type of rock and the method of breaking or loosening. The volume of material indicated in this column plus the premining overburden volume is roughly equivalent to the volume of "spoil" that must be placed back on the mined area or into excess spoil disposal sites, usually valley or durable rock fills in Virginia.

Total Spoil Generated by Mining--The total loose volume of material generated in the mining process of breaking up and the material (overburden) above the coal seam for removal.

Proposed Fill--This column lists the portion of the total spoil material which was not going to be placed on the mined area and that was proposed to be placed in fills, in both percentage and volume terms.

Number of Fills--This is the number of fills into which the proposed fill volume was to be deposited versus those actually constructed.

NA--No data available.

TABLE A-5

Fill Data for Sites Selected for Review
Selected Site

Permit Size (acres)

AOC Variance

Y/N

Premining Overburden

(Millions Cubic Yards)

Predicted Swell

(Percent/ MCY)1

Total Spoil Generated

by Mining

(MCY)1

Proposed

Fill

(Percent/MCY)1

Number

of

Fills Proposed/

Constructed

1100321 156.90

Y

8 54%/ 4.3 12.3 83% / 10.2 1/1
1101115 109.27

Y

NA NA / NA NA NA / NA 0/0
1101308 339.30

Y

52.7 30%/ 15.8 68.5 4% / 2.9 3/3
1101352 658.60

Y

59.0 12% / 7.1 66.1 2% / 1.2 3/3
1101521 258.60

N

20.3 35% / 7.2 27.5 8.4% / 2.3 10/6
1101548 230.16

N

23.7 25% / 5.9 29.6 38.5% / 11.4 3/3
1101556 363.10

Y

31.4 30% / 9.4 40.8 24% /9.8 5/3
1101602 240.00

Y

7.4 25%/ 1.9 9.3 62% / 5.8 4/3
1201133 13.27

Y

.002 NA /NA NA .008 1/1
1601519 226.60

N

6 30% / 1.8 7.8 0.9% / .07 1/1
* NA = No data available I MCY = million cubic yards

b. Mine Classification and Inventory

The electronic database currently used by DMME/DMLR to track permits, inspections, and enforcement actions was not created to meet regulatory requirements, but was developed as a means by which State administrators could monitor agency actions and assess program performance.

State officials have acknowledged that the database was never designed to distinguish between the three types of mountaintop operations. For example, State permitting documents and the database use the term "mountaintop" both to describe operations that will, according to their permits, be returned to AOC and to describe operations that will not be returned to AOC. The State has completed a manual search and has identified 38 sites having mountain top removal variances or steep slope AOC variances and has agreed to continue to review permits during the next quarter to further refine the list. According to DMME/DMLR officials, recommendations have already been made to modify a new data base that is being developed, and the procedures for operating the data base, to capture additional data. Once the new database goes on-line, data can be entered or updated when the permit is approved or as operators submit future permit applications, modifications, renewals, or revisions.

This updated information will differentiate among the three categories of mines described earlier in this report, i.e., (1) mines which remove all of the coal seam or seams in the upper fraction of a mountain or ridge and request a mountaintop removal variance from AOC; (2) mines which remove all of the coal seam or seams in the upper fraction of a mountain or ridge and return the land to AOC; and (3) mines in steep-slope areas (slopes exceeding 20 degrees) which may or may not have received steep-slope AOC variances according to State records.

c. Observed Postmining Land Uses

The review team found that the majority of the sampled permits were approved in accordance with postmining land uses in the approved state program for the various mining types. The team identified two permits where inappropriate postmining land uses were approved for the specific type of mining. See Table A-4, page A-21. Although one mountaintop removal operation was approved with a fish and wildlife postmining land use contrary to the approved program, the area for which the variance was granted has not been, and will not be, mined. One of the steep slope AOC variance sites was approved with an agricultural postmining land use. To prevent future approval of an inappropriate postmining land use for an AOC variance permit or mountaintop removal permit, DMLR revised its findings document to list the allowable land uses.

In its review of those permit applications with mountaintop removal and steep slope AOC variances, the team generally found most of the required documentation (see tables A-6 and A-7).

TABLE A-6

Mountaintop Removal AOC Variance

Criteria for Sites Selected for Review

Required Findings 1101352 1101556 1101308 1100321 1101602
The proposed postmining land use constitutes an equal or better use. Y Y Y Y Y
The proposed use will be compatible with adjacent land uses and existing land use plans. Y Y Y Y Y
County commissions and State and Federal agencies were provided an opportunity to comment on the proposed land use. Y Y Y Y Y
The application contains a specific plan and assurances that:
(1) The proposed postmining land use will be compatible with adjacent land uses. Y Y Y Y Y
(2) The proposed use will be practicable with respect to financing and completing the proposed use. Y Y Y Y Y
(3) The proposed use will be supported by commitments from public agencies where appropriate. NA1 NA1 NA1 NA1 NA1
(4) The proposed use will be planned pursuant to a schedule that will integrate the mining operation and reclamation with the postmining land use. Y Y Y Y Y
(5) The proposed use will be designed by an approved person to assure the stability, drainage, and configuration necessary for the intended use of the site. Y Y Y Y Y
(6) The proposed use is obtainable regarding expected need and market data. (2, 3) (2, 3) (2, 3) (2, 3) (2, 3)
(1) Not Applicable. Applies to PMLU's requiring public financing or support.

(2) DMME/DMLR accepts a letter from the land owner as the need/market data for low intensity agricultural and residential postmining land uses.

(3) OSM is developing guidance addressing this area.

TABLE A-7

Steep-Slope AOC Variance Criteria

for Sites Selected for Review

Required Findings 1101115 1201133
The permit area is located on slopes that exceed an average of 20 degrees. Y Y
All highwalls are completely backfilled. Y Y
Only spoil not necessary to achieve the postmining land use may be removed from the mine bench. Y Y
The permitted and adjacent areas will be improved by reducing pollutants to ground and surface waters and flood hazards. Not found1 Not found1
Appropriate Federal, State, and local governmental agencies were provided an opportunity to comment on the proposed postmining land use and deemed it to be an equal or better economic or public use. Y Y
The plan is designed and certified by a registered professional engineer to assure stability, drainage, and configuration necessary for the intended use of the site. Y Y
The landowner requested in writing that a variance be granted to achieve the approved alternative postmining land use. Y Y
1 DMME/DMLR explained that it had not adequately documented the findings but that they had considered this.

d. Steep-Slope Mining Operations With AOC Variances

Three of the ten permits in our sample were for operations with steep-slope AOC variances. These were included in the sample because the operations are similar in many respects to mountaintop removal operations and because variances under the approved program may be granted only for specific postmining land uses. One of the sampled sites that had been labeled as steep-slope variance in the State database was found to have a mountaintop removal variance instead. One permit for contour mining removed all coal seams at the end of a ridge in a fashion similar to a mountaintop removal operation. The team members found that one underground mine permit had been returned to AOC even though an AOC variance had been granted. DMME/DMLR's actions in these cases, while questionable, did not result in any environmental harm.

e. Site Reclamation and Utility

Although this evaluation concentrated on postmining land use and AOC, the oversight team generally observed that the sites were well revegetated after mining and that reclaimed areas appeared stable.

7. CONCLUSIONS AND RECOMMENDATIONS

The team believes that, overall, even though the study has identified a few weaknesses with the administration of particular aspects of the State program, mining operations in Virginia are generally conducted in a manner that protects the environment. Historically, decisions under the State program, such as permitting actions, have been made with public participation, as required in the program, with few questions or concerns having been raised by the commenters. OSM appreciates the interest expressed by DMME/DMLR in reviewing this topic and its assistance in gathering and analyzing data, and in addressing the few regulatory problems revealed.

The following is a discussion of our conclusions and recommendations for mines returned to AOC and for mines with AOC variances.

a. Approximate Original Contour (AOC)

An examination of all mining in Virginia shows that industry usually returns mine sites to AOC rather than obtaining an AOC variance. Our study also shows that while Virginia has no written guidance for AOC, practical application of the principles has resulted in both variance and AOC sites being returned to a configuration more closely resembling AOC.The team recommends that DMME/DMLR strive for more consistency between permit reviewers in determining when AOC variances are needed.

The permit files for the sampled sites contained no objections from landowners or other interested parties contesting DMME/DMLR's determination that the operations had been designed to restore the approximate original contour.

During the evaluation, the team observed that, in some cases, there is not much difference in the characteristics of mines that have been granted AOC variances and those that are supposed to return the land to AOC. All the sites blend reasonably well with surrounding topography. Contrary to the situation in other states, and because many sites in Virginia have pre-existing benches, Virginia operations generally maintain much more spoil on the bench in both AOC and non-AOC sites. It appears that AOC variances were not required for many of the sites sampled because of this practice.

b. Mine Classification and Inventory

Early on, the review team found that DMME/DMLR's current database was not designed to provide all of the information needed for this study. One of the problems with the current data base is that information pertaining to variances has been entered into the computer at the time the permit application is received and not at the time the permit is actually approved. Another problem is that DMME/DMLR's permitting database has historically classified various mining methods as mountaintop operations regardless of whether an AOC variance had been obtained. These practices have resulted in some sites being improperly classified as mountaintop removal operations, and other sites that were required to obtain variances during the permit review process as not being identified as having variances. DMME/DMLR has responded to these problems by instructing its field inspection staff to verify and supplement the data in its computers. It is currently developing a new tracking system that will classify permits as they are issued or revised. DMME/DMLR's proposed changes to the database and its information collection procedures will enable those using the system to distinguish between the various types of mining operations and variances.

c. Mountaintop Removal Mining And Steep Slope Operations With AOC Variances

Of the ten permits reviewed, seven included mountaintop removal or steep slope variances from AOC. See Table A-4, page A- 21. Most of the land uses associated with these variances related to low intensity agricultural uses such as hay and pastureland. The premining topography on most permits in our sample have naturally occurring flat or gently rolling areas in addition to the steep slopes. Restoration to AOC or near AOC reestablishes the flat or rolling areas for implementing the postmining land use. We did find one mountaintop removal operation with an inappropriate land use but it turned out that the area subject to the variance was never mined. We also found one steep slope operation with an unauthorized land use. DMME/DMLR recognizes these mistakes and is revising its "findings procedures" to eliminate future approval of unauthorized land uses.

d. Permit Documentation

Except as discussed below, OSM found that all of the mountaintop removal permits with AOC variances contained all of the documentation for approving the designated postmining land use. While the team made a determination of completeness regarding the documentation, it did not attempt to determine the adequacy of the documentation in most cases. The mountaintop removal permits with an agricultural postmining land use were approved using the land owners' request as the "need and market data." DMME/DMLR accepts a letter from the land owner as the need/market data for low intensity agricultural and residential postmining land uses. DMLR is changing this practice and is currently developing guidance to ensure compliance with this section.

In steep slope AOC variance cases, the specific documentation of the finding that watersheds be improved was uniformly absent from permits. DMME/DMLR explained that by approving this variance that it has considered this item and made a positive finding. DMME/DMLR, nevertheless, has already started developing procedures to document this finding in writing.

C H A P T E R B.

EVALUATION REPORTS AND CROSS SECTIONS

This chapter contains individual discussions of each of the 10 permits initially selected for this review. Each discussion describes the type of mining, mining status, postmining land use, and AOC status of the permit, as well as the number of excess spoil fills constructed or to be constructed at the site.

It is difficult, by narrative means alone, to adequately compare the final contour of a section of reclaimed land to the premining contour of the same area. Therefore, OSM has included computer-generated cross sections of each permit area.

The cross sections support the narrative descriptions provided for each permit. The cross sections in this report are intended to compare the premining topography with the final configuration after mining and reclamation. In order to provide a better understanding of this relationship, a brief description of these cross sections, and how they were derived, follows:

A 1968 Bureau of Mines publication, A Dictionary of Mining, Mineral, and Related Terms (U.S. Department of the Interior, 1968), defines cross section as a "profile portraying an interpretation of a vertical section of the earth ..." Generally, in mine surveying, this would involve establishing a baseline on a topographic map so that it would run the centerline and the length of a ridge or mountain. The next step in the process would be to profile or take cross sections of the baseline, usually every 100 feet. This process necessitates determining the ground elevation at known points along the cross section line. These cross sections, taken at right angles or perpendicular to the baseline, represent a slice "through the mountain" and provide a vertical profile of the existing terrain.

For this evaluation, the evaluation team established a line that, in its judgment, would be representative of the centerline of a ridge or mountain and made the measurements along that one line as opposed to measuring points on several lines at right angles from the centerline.

Therefore, although data from the permits was often used in the development of the cross section, the representations in this report may appear different from cross sections in the permit that were taken in different places or at different angles from the selected line.

The premining configuration, (ORIGINAL GROUND on the cross sections) was plotted from existing topographic maps while postmining configurations were surveyed by a global positioning system (GPS). Both configurations were plotted (translated to a graph) on the same scale to compare the premining configuration with the postmining configuration.

The team encourages readers to cross-reference the figures, tables, graphs, and cross sections with the descriptions of the 10 permit areas UNDER discussion here.

1. Virginia By Products Division of Knox Creek

Permit 1100321

Site Designation: Bond Released Mountaintop Removal Permit

Virginia By Products Division of Knox Creek , Permit No. 1100321; Issued Nov. 29, 1983

Location: Lat. N 37° 21' 19", Long. W 81° 57' 17", in Buchanan County, Virginia

File Review Date: November 30, 1998

Mining Type: This surface mining permit is a 156.9 acre mountaintop removal operation with an approved variance on all coal removal areas. This operation mined the Blair and Eagle coal seams using the mountaintop removal mining method. No site visit was conducted on this mining operation.

Mining Status: Mining has been completed and this permit has been reclaimed since September 3, 1992. The entire permit has been stabilized with vegetation. A phase III bond release was approved on December 16, 1997.

Postmining Land Use: DMME/DMLR originally approved an agricultural postmining land use of hayland/pasture for the entire permit. The premining land use was unmanaged forest. A field visit conducted by OSM in conjunction with the bond release found that the mind area was stabilized with a vegetative ground cover. The bond release found that postmining productivity exceeded premining productivity and that ground cover was 94%.

Approximate Original Contour: The mountaintop removal variance approved for the entire mined area allows the area to be restored to a gently rolling plateau with an inward draining hydrologic system. Permit cross-sections show a maximum elevation change of -140 feet and an average change of -95 feet. Because the permit has been bond released and a we no longer have right of entry authority, we did not field survey this site. We did not reproduce or include the permit cross-sections in this report. Field observation from the bond release inspection did not identify major changes in drainage patterns.

Excess Spoil Fills: The permit identifies specific spoil volumes for bank (in situ) as eight million cubic yards and bulked or loose spoil volume as 12.3 million cubic yards. The increase in spoil volume due to swell is shown as 4.3 million cubic yards. The original permit proposed to permanently store 10.2 million cubic yards in a durable rock fill. Evaluation of the October 24,1997, bond release inspection found that the valley fill was installed.

2. Paramont Coal Corp.

Permit 1101115

Site Designation: Steep Slope AOC Variance

Paramont Coal Corp., Permit # 1101115, Permit issued April 20, 1988

Location: Lat.: 37° 02' 57", Long.: 82° 35' 05", in Wise County, Virginia

Field Review Date: December 3, 1998

Mining Type: This is a completed 109.27 acre steep slope contour mine. One area was revised for a steep slope AOC variance. The AOC variance area did not contain pre-SMCRA mining disturbances. A postmining permit revision provided a cross-section (I-I') in the variance area. It shows the premining contours, the coal excavation limits and the final regrading contours. Cross-section I-I' shows an original contour steep slope profile reclaimed nearly level for 400 feet and then backfilled at 2:1 with the highwall eliminated. A GPS cross-section shows a maximum reduction in elevation of 80 feet and an average reduction in elevation of 45 feet.

Mining Status: Coal removal was completed in 1990. In 1990, DMME/DMLR accept an as-built regrade profile as AOC. The AOC variance area was revised into this permit in 1994 subsequent to a joint OSM/ Virginia DMME/DMLR inspection report and state notice of violation.

Postmining Land Use: The alternative postmining land use for the AOC variance area is agricultural (commercial tree farm). It has not been effectively implemented. The Virginia program has not approved agriculture or commercial forestry as a postmining land use for AOC variance areas on steep slopes. The premining land use is identified as unmanaged forest and previously mined lands.

Approximate Original Contour: A variance from AOC restoration was approved by Virginia DMME/DMLR for part of the permit area. The highwall was completely eliminated in the regrading. Field observations did not identify any major changes in the original drainage patterns.

Excess Spoil Fills: No excess spoil fills were planned for this operation. Earthwork calculations for this site were not present in the permit package.

3. Jewell Smokeless Coal Corp.

Permit 1101308

Site Designation: Mountaintop Removal Permit

Jewell Smokeless Coal Corporation Permit No. 1101308 Issued January 14, 1991

Location: Lat. 37° 01' 30", 82° 33' 00", in Wise County, Virginia

Field Review Date: November 24, 1998

Mining Type: This is a mountaintop removal permit, with associated contour and auger mining. The mountaintop removal variance applies only to a portion of the permit. The permit narrative requested the mountaintop removal variance to create useable flat land for the approved agricultural postmining land use of hayland/pasture.

Mining Status: This is a reclaimed 339.3 acre permit with complete bond release. The permit review included a check of the DMME/DMLR permit file and cross sections A-A and B-B. These cross sections traversed mountaintop and finger ridge coal removal areas. Included in the permit file review with DMME/DMLR, this permit was photographed from adjacent A & G Coal Corporation, PN 1101352 on November 24, 1998, for a general view of the postmining topography.

Postmining land Use: DMME/DMLR approved a postmining land use of hayland/pasture. The premining land use in this area included unmanaged forest, previously surface mined lands and agriculture. The approved postmining land use for the AOC variance (agriculture-hayland/pasture) is appropriate for this permit. At this time the postmining land use it fully implemented on the variance area. The permit consist of a plateau with hay rolls evident. Grazing livestock was observed on November 24, 1998.

Approximate Original Contour: The operation has been approved for an mountaintop removal permit. Permit cross-sections identify a maximum elevation change of -50 feet with an average change of -8 feet. We did not reproduce or include the permit cross-sections in this report. Field observation failed to identify major changes in drainage patterns.

Excess Spoil Fills: The approved permit identified 52,745,185 cubic yards of spoil with 30% swell (15,823,556 cubic yards) for a total of spoil volume of 68,568,741 cubic yards. A total of 2,921,888 cubic yards of excess spoil will be placed in fills. Completed Valley fill A is designed for 547,300 cubic yards, Valley fill B for 1,709,900 cubic yards, and Valley fill C for 664,688 cubic yards which balances the spoil volume. Completed Valley fills A, B and C have a total spoil volume of 2,921,888 cubic yards.

4. A & G Coal Corporation

Permit 1101352

Site Designation: Mountaintop Removal Permit

A & G Coal Corporation Permit No. 1101352 Issued June 24, 1991

Location: Lat. 37° 01' 20", Long. 82° 31' 00", in Wise County, Virginia

Field Review Date: November 24, 1998

Mining Type: This is a mountaintop removal, contour, auger mining operation. The mountaintop removal variance applies to approximately 30 acres of this 658.6 acre active mountaintop permit.

Mining Status: This permit is active with approximately 221 acres regraded and vegetated and with 564.34 acres disturbed.

Postmining land Use: DMME/DMLR approved a postmining land use of unmanaged forest and hayland/pasture. The premining land use in this area included unmanaged forest, previously surface mined lands and agriculture. This approved postmining land use (agriculture-hayland/pasture) for the AOC variance is appropriate for this permit. At this time the postmining land use it not fully implemented on the variance area.

Approximate Original Contour: The permit narrative requests the mountaintop removal variance in the vicinity of cross section 2-2 and 4-4. These sections identify removal of approximately 150 feet of overburden with a regrade line gently sloped inward to an outlet drainage ditch, to create useable flat land for the postmining land use. The rest of the permit will be reclaimed to AOC. The GPS field cross sections 2-2 and 4-4 conformed closely to the original proposed cross section in the permit package on the AOC variance area. The final regraded land form is approximately 35' higher than proposed regraded land form with outslopes still consistent with approved plans. All mining is completed along sections 2-2 and 4-4. The GPS survey showed maximum elevation changes of -110 feet with an average change of +35 feet. Field observation did not identify major changes to drainage patterns.

Excess Spoil Fills: The approved permit identifies 59,044,000 cubic yards of spoil with 12% swell (7,085,280 cubic yards) for a total of 66,129,280 cubic yards. A total of 1,245,943 cubic yards of excess spoil will be placed in fills. Completed Valley fill #1 is designed for 1,090,694 cubic yards, Existing bench fill #1 for 85,958 cubic yards, and Existing bench fill #2 for 69,291 cubic yards which balances the spoil volume. Over half of this permit has active mining with spoil placement continuing. The calculation noted above relates to the cross section areas 2-2 and 4-4 only. Completed Valley fill #1 and Bench fills #1 and #2 have a total spoil volume of 1,245,943 cubic yards.

5. Clinchfield Coal Company

Permit 1101521

Site Designation: Steep Slope and/or Area Mine Restored to the AOC

Clinchfield Coal Company, Permit No. 1101521; Issued January 23, 1995

Location: Lat. N 37° 00' 30", Long. W 82° 14' 15", in Dickenson County, Virginia

Field Review Date: December 2, 1998

Mining Type: This is a 258.60 acre contour and auger mining operation in steep slope areas. AOC restoration was required on this site. The five coal seams originally proposed to be partially mined were mined. The global positioning system (GPS) field cross-sections C and the north half of G were similar to the original postmining sections; however, the GPS cross-sections D and H were lower in elevation than the approved ones.

Mining Status: All mining has been completed and this permit has been reclaimed and vegetated since June 5, 1997.

Postmining Land Use: DMME/DMLR approved a postmining land use of unmanaged forest. The premining land use was also unmanaged forest. On September 2, 1998, the postmining land use was changed on a small portion of the permit to a commercial use of light industry because that area was proposed for redisturbance by a gas company to install gas lines across the permit. The field visit found that the entire surface mined area was stabilized with a vegetative ground cover which included trees and shrubs; gas lines had recently been installed across the permit. The gas line disturbance was minimal and a young vegetative cover had been started on those disturbed areas.

Approximate Original Contour: The proposed backfill was similar to the premining configuration. In one area the backfill toe was located approximately 275 feet from the outcrop leaving a bench which was not originally present; therefore, less material was placed in this area than was originally present. The backfill toe in another area was located approximately 180 feet from the outcrop and the original ground in this area was gently sloping for approximately 400 feet from the outcrop; therefore, more material was placed in this area than was originally present. On another area the backfill was flat on top instead of rolling and was an average of 16 feet lower in elevation. A GPS survey of the site found a maximum elevation change of -50 feet and an average change of -16 feet. No major changes in drainage patterns was noted.

Excess Spoil Fills: The original permit identifies 22.6 million cubic yards (CY) of bank (in situ) spoil volume for the entire permit. The permit did not give figures for swell amounts. Based on information obtained during the field visit, the final total overburden volume was estimated to be 27,459,000 CY using a 35 percent swell and deleting 10 percent for the undisturbed areas. The original permit proposed to permanently store 2,291,160 CY in ten durable rock fills. During mining, the volumes of two fills were changed, seven fills were deleted, and three small side hill fills were added for a total final fill volume of 2,286,700 CY.

6. Motivation Coal Company

Permit 1101548

Site Designation: Steep Slope and/or Area Mine Restored to AOC

Motivation Coal Company, Permit # 1101548, Permit issued November 29, 1995

Location: Lat.: 37° 12' 30", Long.: 82° 09' 00", in Buchanan County, Virginia

Field Review Date: December 3, 1998

Mining Type: This is a 230.16 acre area and contour mining operation that is being returned to AOC. The permit includes some areas of pre-SMCRA mining. The permit plans provide cross-sections indicating the premining elevations, the coal excavation limits on three seams, and the planned and/or completed post-construction cross-sections. Cross-sections B-B' and D-D' were identified as representative of the regraded areas during the review. Two coal seams were entirely mined out in the area of these cross-sections. The restored ridge line has similar slopes and slightly reduced maximum elevations compared to the original ground. Berm diversions along the outcrop barriers and sediment structures have caused minor outslope set-backs. These set-backs contribute to the lower maximum elevations in the regraded areas.

Mining Status: This is an active mine that is removing coal. An estimated 210 acres have been disturbed.

Postmining Land Use: The permit was approved with a postmining land use of unmanaged forest. The permit identified the premining land uses as unmanaged forest and previously mined areas.

Approximate Original Contour: As approved by Virginia DMME/DMLR, the permit area is being returned to AOC. A GPS survey found that the contour had been reduced a maximum of -140 feet with an average change of -45 feet. Field observations did not identify any major changes from the original drainage.

Excess Spoil Fills: The permit identifies 23.7 million cubic yards of spoil with a 25 percent swell factor for a total overburden volume of 29.6 million cubic yards. The permittee proposes to place 11.4 million cubic yard of spoil in three excess spoil disposal fills. At the time of our visit, two fills are completed and one is under construction.

7. Cumberland Mountain Mining, Inc.

Permit 1101556

Site Designation: Mountaintop removal permit /Area and Contour Operation

Cumberland Mountain Mining, Inc. Permit No. 1101556 Issued May 03, 1996

Location: Lat. 37° 19' 00", Long. 82° 13' 00", in Buchanan County, Virginia

Field Review Date: November 19, 1998

Mining Type: This is a 363.10 acre mountaintop removal permit also containing contour and auger mining. The permit narrative requested the mountaintop removal variance on a portion of permit. This area was never mined. The rest of the permit was returned to AOC.

Mining Status: This permit is inactive with all mining completed on October 21, 1997. The company mined and disturbed 95 acres with no mining conducted on the mountaintop removal area. The mine disturbance on this permit included a sediment basin in the hollow, haulroad, road fill, two head-of-hollow fills and approximately 4,600 feet of contour bench and finger ridge coal removal.

Postmining land Use: DMME/DMLR approved a postmining land use of fish and wildlife habitat which included wetland construction and establishment of vegetation to enhance wildlife. The premining land use in this area included unmanaged forest and previously surface mined lands. Fish and wildlife habitat is not an approved postmining land use for which an AOC variance can be granted. In this case the AOC variance area was not mined or disturbed. The disturbed contour mining areas have been reclaimed. At the time of field inspection, the postmining land use was not fully implemented -- grasses were established, but shrubs, trees and wetland were not.

Approximate Original Contour: The part of the permit with mountaintop removal variance was never mined. The remainder of the permit was returned to AOC. We did not include cross-sections of the AOC areas in this report. Runoff patterns were not significantly altered by this mining operation.

Excess Spoil Fills: The approved permit identifies 31,438,735 cubic yards of spoil with 30% swell (9,431,620 cubic yards) for a total of 40,870,355 cubic yards. Regrading will use 31,082,067 cubic yards leaving 9,788,288 cubic yards excess spoil. Road fill #1 is designed for 71,973 cubic yards, Valley fill #1 for 533,333 cubic yards, Valley fill #2 for 2,339,258 cubic yards, Valley fill # #3 for 4,111,111 cubic yards, and Valley fill #4 for 2,906,666 cubic yards for a total of 9,962,341 cubic yards which makes the spoil volume balance within 2%. The three fills disturbed and used were Road fill #1, Valley fill #1 and Valley fill #2 with total spoil volume proposed of 2,944,564 cubic yards. Excess spoil disposal on this permit is less than proposed because much of the permit was not mined.

8. Paramont Coal Corporation

Permit 1101602

Site Designation: Mountaintop removal Permit

Paramont Coal Corporation, Permit No. 1101602; Issued May 23, 1997

Location: Lat. N 36° 59' 42", Long. W 82° 19' 52", in Dickenson County, Virginia

Field Review Date: December 1, 1998

Mining Type: This is a 240 acre mountaintop removal permit with an approved variance on mining areas B1 and B2. These areas are represented on cross-sections A, C and D. The variance areas were not clearly identified in the permit. The Dorchester coal seam splits were proposed to be entirely mined.

Mining Status: All mining has been completed since June 29, 1998, and this permit has been reclaimed and vegetated. The field visit found that the splits of the coal seam were mined entirely as proposed in the permit.

Postmining Land Use: DMME/DMLR approved a postmining land use for the AOC variance areas of hayland/pasture. The premining land use for the permit was hayland/pasture and unmanaged forest. The permit includes letters from the landowners that indicate a desire for hayland/pasture as the postmining land use. The field visit found that the entire surface mined area was stabilized with a vegetative ground cover and cattle were grazing on the permit.

Approximate Original Contour: The proposed backfill on the mountaintop removal areas was to be a flat to gently rolling plateau. The global positioning system (GPS) field cross-sections A and C conformed closely to the approved cross-sections A and C; however, GPS field cross-section D was higher in elevation than the originally approved cross-section D. The GPS survey identified an maximum change in elevation of -100 feet, with an average change of -52 feet. Runoff patterns were not significantly altered by this mining operation.

Excess Spoil Fills: The original permit identifies 7.4 million cubic yards (CY) of bank (in situ) spoil volume for the entire permit and a 25 percent swell (1.9 million CY) for a total spoil volume of 9.3 million CY. The original permit proposed to permanently store 5.8 million CY in four fills. The field visit found that two fills were completed as designed, one fill was built smaller than designed, and one fill was not built. Final fill volume data was not available.

9. Dominion Coal Corporation

Permit 1201133

Site Designation: Steep Slope Mine with an AOC Variance

Dominion Coal Corporation, Permit No. 1201133; Issued March 27, 1991

Location: Lat. N 37° 10' 15", Long. W 82° 02' 30", in Buchanan County, Virginia

Field Review Date: December 1, 1998

Mining Type: This is a underground mining operation that had three portal areas in steep slope terrain identified as portal areas A, B and C. This operation mined the Kennedy coal seam using the room and pillar mining method. Portal areas A and B were initially required to be backfilled to AOC. Portal area C was constructed on an existing bench, without taking a second cut on the highwall, and all available material was required to be used to backfill this area. On November 19, 1996, an AOC variance was approved for portal area B as represented by cross-section A. The AOC variance on portal area B was the subject of this review. The global positioning system (GPS) field cross-section A at portal area B was similar to the approved postmining cross-section A.

Mining Status: All mining has been completed and this permit has been reclaimed since February 4, 1997. The entire permit has been stabilized with vegetation. A phase III bond release was approved on June 4, 1997, for the portion of portal area B being used for light industry and this reduced the permit to 13.27 acres.

Postmining Land Use: DMME/DMLR originally approved a postmining land use of unmanaged forest for the entire permit. The premining land use was also unmanaged forest. The AOC variance request included a change in the postmining land use to light industrial for that portion of portal area B. The AOC variance approval did not include a demonstration that the watershed would be improved. The field visit found that the backfill on the variance area was stabilized with a vegetative ground cover. The bond released portion of the variance area was actively being used by a construction company as approved in the postmining land use change.

Approximate Original Contour: The AOC variance approved at portal area B changed the backfill regrade from highwall elimination using a premining 32 degree backfill slope to highwall elimination using a 38 degree backfill slope, as shown by cross-section A. Our GPS survey of this area showed maximum elevation change of +20 feet and an average change of +8 feet. Runoff patterns were not significantly altered by this mining operation.

Excess Spoil Fills: The original permit proposed to construct a permanent refuse disposal valley fill above portal area B; however, this fill was never constructed. Portal area B was constructed by placing the spoil in a fill across the small hollow below the portals. This fill had an estimated volume of 8,518 cubic yards and formed a work bench for the minesite. The AOC variance included changing this fill to a permanent structure to facilitate the light industrial land use and using borrowed material from the refuse fill site to backfill the highwall.

10. Sigmon Coal Company, Inc.

Permit 1601519

Site Designation: Steep Slope and/or Area Mine Restored to the AOC

Sigmon Coal Company, Inc., Permit No. 1601519; Issued December 14, 1994

Location: Lat. N 36° 51' 20", Long. W 82° 55' 26", in Lee County, Virginia

Field Review Date: November 24, 1998

Mining Type: The surface mining portion of this 226.6 acre permit is a steep slope and/or area-type mining operation that mined through rolling terrain and pre-existing mining disturbances. The permit narrative considers the final proposed regrade as AOC. The Kelly and Kelly Rider coal seams were proposed to be entirely mined. An excess spoil side hill fill was added on November 14, 1995 for the first cut material.

Mining Status: This permit is divided into two separate mine areas connected by an access road. One area is a surface mining area which is the subject of this review. The second area is proposed for four underground mines. As of the date of the field inspection, underground mining had not yet begun. Surface mining was completed sometime around 1996. The field visit found that both coal seams were mined entirely as proposed in the permit (except for one area) and that the outcrop barrier was retained.

Postmining Land Use: DMME/DMLR approved a postmining land use of unmanaged forest on the outslopes and hayland/pasture on the remainder of the permit. The premining land use was unmanaged forest and existing mining disturbances. The permit includes letters from the landowners that indicate a desire for hayland/pasture as the postmining land use. The permit also says the dual postmining land use will be compatible with the surrounding area. The field visit found that the entire surface mined area was stabilized with a vegetative ground cover and that horses were grazing and fences were installed on the hayland/pasture portion; however, trees and shrubs had not been planted on the unmanaged forest portion.

Approximate Original Contour: The proposed backfill was similar to the premining configuration except it was 20 feet higher (original cross-section A) and the pre-existing highwalls were eliminated. Our GPS survey found that the operations decreased the elevation by a maximum of 60 feet, with an average change of -32 feet. Runoff patterns were not significantly altered by mining activities.

Excess Spoil Fills: The original permit identifies 6 million cubic yards (CY) of bank (in situ) spoil volume for the entire permit and a 30 percent swell (1.8 million CY) for a total spoil volume of 7.8 million CY. No excess spoil fills were originally proposed. The side hill fill that was added to the permit was proposed to contain 70,000 CY; however, the field visit found that only about half the proposed amount of spoil (35,000 CY) was placed in the fill.

A P P E N D I X I .

DMME/DMLR - OSM OVERSIGHT WORK PLAN

PERFORMANCE AGREEMENT

SPECIAL OVERSIGHT STUDY

OF

APPROXIMATE ORIGINAL CONTOUR,

Postmining LAND USE,

AND

EXCESS SPOIL DISPOSAL

PERFORMANCE AGREEMENT

Between

Office of Surface Mining

Big Stone Gap Field Office

And

Department of Mines, Minerals and Energy,

Division of Mined Land Reclamation

Evaluation Year 1999

PERFORMANCE AGREEMENT

I. INTRODUCTION

The Big Stone Gap Field Office (BSGFO) of the Office of Surface Mining (OSM) and the Department of Mines, Minerals and Energy, Division of Mined Land Reclamation (DMME/DMME/DMLR) agree to work together to examine aspects of surface mining operations which include:

The evaluation focuses on the following questions related to these type operations:

II. IMPLEMENTATION

BSGFO will brief DMME/DMLR on the preliminary findings as they are developed. DMME/DMLR comments will be taken into consideration in preparation of the draft reports, and DMME/DMLR will be provided the draft report for review and comment. Any DMME/DMLR comments not incorporated into the final report will be included as an appendix to the final report.

A. Scope of Mountaintop removal and Steep slope AOC variances

DMME/DMLR will develop an inventory of mountaintop removal and steep slope operations, consistent with the description and meanings described in the above section titled "Introduction". The inventory will come from the DMME/DMLR inspectable units list and DMME/DMLR will make available to OSM the bond released mountaintop and other steep slope sites with an AOC variance contained in the DMME/DMLR permitting and enforcement data bases. DMME/DMLR field inspection staff will field verify the number of AOC variances applicable to currently bonded permits and collect general data about those mines. DMME/DMLR and OSM anticipates that this inventory will be completed and provided to BSGFO on November 17, 1998.

B. Sampling

Preliminary estimates indicate that Virginia has a population of six mountaintop removal permits pursuant to 4 VAC 25-130-785.14 with AOC variances. Currently DMME/DMLR estimates that there are approximately 16 area mining permits which are required to restore the AOC, and an unknown number of steep slope mines that have obtained an AOC variance.

The sample for the study will include 10 permits selected for permit file review and field inspection. The sites will be broken down as follows:

These selections will be based on the inventory and will be selectively picked to obtain the specified sample, with emphasis on more recent approvals where operations have advanced to the reclamation stage to allow an evaluation of the approved land configuration. Bond released sites will be selected from those most recently released which contained an approved variance from AOC.

C. Review Methodology

This study will determine if the approved State regulatory provisions relating to AOC, variances from AOC and PMLU. are being implemented pursuant to applicable regulatory provisions. The study will also review spoil balance calculations in the sampled permits to determine if excess spoil volumes are within expected engineering norms and if the excess spoil volumes approved for placement in fills outside of the mine pit are based upon accepted engineering norms for swell and compaction percentages.

Permit documents for the operations will be reviewed to determine if all approved program requirements related to approval of an AOC variance and changing of the PMLU. have been met. When available, digitized maps of the operation will be used to compare premining topography and postmining topography. The field review will determine if the operations are proceeding pursuant to approved plans, the final surface configuration is consistent with the approved permit and whether the alternative PMLU. is being developed, or for bond released sites has the requirement for bond release have been met in regards to postmining land use in accordance with the plans and schedule required by DMME/DMLR. Geo- Referencing of the major features of the mine site will be accomplished.

The following activities will occur to complete this evaluation:

  1. Create a joint DMME/DMLR/OSM team.
    1. Name the OSM team leader.
    2. Name the DMME/DMLR team leader.
    3. Select team members.

  1. Team members will complete the following:
    1. Apportion assignments.
    2. Develop the review forms.
  2. Select permits.

    1. Selectively pick the permits from the inventory to obtain the required mix of operational types and operational status to allow review of the applicable standards.
  1. Conduct review of permit plans, AOC variance provisions, PMLU. provisions and spoil balance equations. (Use Permit Review Form, to be developed).

    1. Identify types and locations of AOC variances within specific permit.

    1. Identify AOC variance conditions.

    1. Determine if AOC variance(s) were issued in accordance with approved program.

    1. Review and tabulate bank (in situ) spoil volume for permit.

    1. Review and tabulate bulked or loose volume for permit.

    1. Review and tabulate excess spoil calculations for permit.

    1. Identify excess spoil volumes approved for fill placement

    1. From permit cross-sections determine maximum, minimum and average elevation changes, if any.
  1. Conduct field review of the sample permits (Use Site Review Form, to be developed).

    1. Conduct a "plan-in-hand" site visit with State personnel.

    1. Note latest revisions and amendments to actual earthwork.

    1. Compare on-the-ground conditions with approved plans, final cross-sections and latest revisions to such.

    1. Make horizontal and vertical measurements as required to verify plan and "as built" data.

    1. Photograph land forms as required.

  1. Coordinate with other agencies, as necessary.

    1. If AOC variance involves local or regional planning agency contact agency to verify variance purpose and data.

    1. Contact other State and Federal agencies concerning AOC variance conditions as need arises.

  1. Compile final report.

    1. Use the Permit Review and Site Review Forms that are to be developed.

    1. Results will be grouped in tabular form based on type of variance, type of mining, and postmining land use.

III. REVIEW PERIOD

The permit, map, and site reviews will be completed by January 1, 1999.

IV. REPORT AND RECOMMENDATION

DMME/DMLR will be briefed on the review as it progresses. A draft report will be submitted to the BSG Field Office Director and the Director, Division of Mined Land Reclamation two weeks after completion of the permit, map, and site reviews. A copy of the draft report will be submitted to the Appalachian Regional Coordinating Center (ARCC) for comment and consideration of their national concerns. The final report will address comments submitted on the draft and will be completed by February 1, 1999, approximately two weeks after distribution of the draft.

V. COORDINATION AND ADMINISTRATIVE MATTERS

DMME/DMLR technical personnel will be assigned to the Team (as workload and resources allow) and will provide technical input, guidance and support. An OSM technical representative will also be assigned to the Team to assist in the review. The OSM/DMME/DMLR review Team may determine that additional technical assistance is necessary on a case-by-case basis. The assistance may be provided by ARCC staff and/or DMME/DMLR technical personnel.

OSM and DMME/DMLR agree that the primary emphasis of this review is to evaluate mountaintop removal and AOC variances. DMME/DMLR will be responsible for taking appropriate enforcement action on any violation discovered during the review. For permit deficiencies identified during the review, DMME/DMLR will be responsible for taking appropriate action under their program. However, performance standard violations or permit deficiencies not addressed by DMME/DMLR will be handled through the TDN process.

VI. REFERENCES TO ADDITIONAL MOUNTAINTOP REMOVAL / VALLEY FILL STUDIES

The Environmental Protection Agency, the U.S. Army Corps of Engineers, and the U. S. Fish and Wildlife Service are planning to conduct a joint federal evaluation of the impacts and regulation of valley fill activities in the Appalachian Region. This will include the States of Pennsylvania, Maryland, Ohio, West Virginia, Virginia, Kentucky, and Tennessee.

VII. SIGNATURES

Representing OSM and DMME/DMLR, the following officials agree to the objectives and steps outlined in this plan:

Big Stone Gap Field Office Department of Mines, Minerals and Energy,

Division of Mined Land Reclamation

_________________________ __________________________

Robert A. Penn, Director Benny Wampler, Deputy Director

Date:_____________________ Date:______________________

A P P E N D I X I I .

OSM DIRECTIVE INE - 26, APPROXIMATE ORIGINAL CONTOUR

A P P E N D I X I I I .

LIST OF ONGOING VIRGINIA MOUNTAINTOP PERMITS AS OF NOVEMBER 1, 1998

ON-GOING MOUNTAINTOP REMOVAL PERMITS

Permittee Permit Number
A & G Coal Corp. 1101352
ANR Coal Co., LLC 1101537
Cumberland Mountain Mining, Inc. 1101556
Virginia Energy, Inc. 1101550
H. C. Bostic Coal, Co. 1100536
Gromet Coal Co., Inc 1100558

A P P E N D I X I V .

LIST OF MOUNTAINTOP AND AREA MINING PERMITS USED TO SELECT SITES FOR EVALUATION

Sample Population

Permittee Permit Number Variance Type
Lone Mountain Processing, Inc. 1201386 Steep Slope
Westmoreland Coal Co. 1201408 Steep Slope
Westmoreland Coal Co.. 1201462 Steep Slope
Powell Mountain Coal Co. 1200863 Steep Slope
Lone Mountain Processing, Inc. 1201395 Steep Slope
Whitely Fork Coal Corp. 1601611 Steep Slope
Alliance Coal Corp. 1601656 Steep Slope
BJ's Coal Sales, Inc. 1301282 Steep Slope
Motivation Coal Co. 1101594 Steep Slope
Paramont Coal Corp. 1101602 Steep Slope
Paramont Coal Corp. 1101115 Steep Slope
A & G Coal Corp. 1101352 Mountain Top
ANR Coal Co., LLC. 1101537 Mountain Top
Paramont Coal Corp. 1201526 Remine
Harman Mining Corp. 1200200 Steep Slope
Harman Mining Oorp. 1200273 Steep Slope
Harman Mining Corp. 1200297 Steep Slope
Patrick Coal Corp. 1200591 Steep Slope
Harman Mining Corp. 1201364 Steep Slope
Kyber Coal Co. 1300935 Dock
Highwall Mining Co. of Va., Inc. 1101560 Steep Slope
Cumberland Mountain Mining , Inc. 1101556 Mountain Top
Wellmore Coal Corp. 1201435 Steep Slope
Gromet Coal Co., Inc. 1101558 Mountain Top
Virginia Energy Co. 1101550 Mountain Top
Motivation Coal Co. 1101607 Steep Slope
Harold Keene Co., Inc. 1201497 Steep Slope
Dominion Coal Corp. 1201133 Steep Slope
Permac, Inc. 1200727 Steep Slope
Permac, Inc. 1201311 Steep Slope
Virginian By-Products, Div. of Knox Creek 1300313 Steep Slope
Wellmore Coal Corp. 1301640 Steep Slope
Permac, Inc. 1201407 Steep Slope
Doris Coal Co. 1200512 Steep Slope
Knox Creek Coal Corp. 1200235 Steep Slope
Knox Creek Coal Corp. 1301156 Steep Slope
Jewell Ridge Coal Corp. 1201608 Steep Slope
Knox Creek Coal Corp. 1401366 Steep Slope
H. C. Bostic Coal Co. 1100536 Mountain Top
Consolidation Coal Co. 1201653 Steep Slope

A P P E N D I X V .

VIRGINIA SURVEY FORM

EY 99 SPECIAL STUDY ON VIRGINIA SITES

FOR: AOC, PMLU. AND EXCESS SPOIL DISPOSAL

I. GENERAL INFORMATION

(All cited regs. begin with prefix: "4 VAC 25-130-" unless stated otherwise)

(Use * to indicate an item has comments at the end of Sections II and III)

a) Bonded Mountaintop removal Permit With An AOC Variance

b) Bond Released Mountaintop removal Permit

c) Stee4p Slope and/or Area Mines Restored to the AOC

d) Steep Slope Area Mines (contour) With the AOC Variance

8. Identify Locations of AOC Variances (Mtn-top or Steep Slope) on the Permit:

9. General Information Narrative:

II. PERMIT REVIEW

a) Inward Draining Plateau b) Ridge c) Mountain

d) Small Knoll (or Hill) e) Existing Contour Benches

a) Inward Draining Plateau b) Ridge c) Mountain

d) Small Knoll (or Hill) e) Existing Contour Benches

f) Closely Resembles Pre-mining Configuration

a) Equal to or Better Than the Premining Land Use? (Yes, No or N/A) (816.133(a) &

(785.14(c))

b) Higher or Better (Alternative) Land Use? (Yes, No or N/A) (816.133(c))

a) Approved in One (or more) of the Following Categories? (Yes or No) (use "X" to check the category(ies)) (785.14(c)(1)

I) Industrial

ii) Commercial

iii) Agricultural

iv) Residential

v) Public Facility (Including Recreational Facilities)

Explain, if No, or if the Land Use is not Obviously Approvable Under One of the Categories:

b) Compatible With Adjacent Land Uses? (Yes or No) (785.14(c)(1)(iii)(A)

c) Obtainable based on Need and Market? (Yes or No) (785.14(c)(1)(iii)(B)

d) Assured of Investment in Necessary Public Facilities (Yes or No) (785.14(c)(1)(iii)(C)

e) Practicable With Respect to Achieving the Use and Private Financing (Yes or No)

(785.14(c)(1)(iii)(E)

f) Supported by Public Agencies Where Appropriate (Yes or No) (785.14(c)(1)(iii)(D)

g) Planned Pursuant to a Schedule That Will Integrate Mining and Reclamation With the PMLU. (Yes or No) (785.14(c)(1)(iii)(F)

h) Designed by an Approved Person (RPE) to Assure the Stability, Drainage, and Configuration Necessary for the Intended Use of the Site (Yes or No)

(785.14(c)(1)(iii)(G)

I) For "a" Through "f" above, and for Items 8. a) and 10., Did DMME/DMLR Make Written Findings? (Yes/No, if No explain) (785.14(c))

B. For Mountaintop Removal Mining:

a) Is the Permit Clearly Identified as Being for Mountaintop Removal Mining? (Yes or No, explain if No) (785.14(c)(5))

b) Are the Permits Incorporating a Variance Under the Mountaintop Removal Mining Under Section 785.14, Being Reviewed by the DMME/DMLR to Establish That the Permittee Is in Compliance With the Terms of the Variance? (Yes or No) (785.14(d)(1&2))

a) Do the Pre-mining Slopes Exceed an Average of 20 Degrees (Yes/No, explain if No)

b) (USE AVAILABLE ENGINEERING ASSISTANCE TO DETERMINE) For Sites with Alternate PMLU., Does the Application Demonstrate That the Watershed of the Permit and Adjacent Area Will Be Improved In Accordance With (785.16(a)(3)) (Yes/No or Could Not Determine)

c) Was the PMLU. Deemed To Be of an Equal or Better Economic or Public Use After Appropriate Federal, State and Local Government Agencies Were Provided an Opportunity to Comment. (Yes/No, Explain if No) (785.16(a)(3)(iii))

d) Identify the Agencies Consulted With Prior to Permit Approval.

(785.16(a)(3)(iii) & (816.133(a))

e) Was the Plan Designed by an Engineer (RPE) to Assure Stability, Drainage and Configuration Necessary for the Intended PMLU.? (Yes/No, Explain if No)

(816/817.133(d)(5))

f) Did the Landowner(s) Request Approval of the Steep Slope AOC Variance to Achieve the PMLU.? (Yes/No, Explain if No) (785.16(a)(4))

a) Review Permit and Tabulate Bank (in situ) Spoil Volume for Permit (Cubic Yards)

e) Identify the Bulk or Swell Factor (Percent)

f) From the Permit Cross-sections (for the Inventory Focus Area), Determine the:

I) Maximum Change In Cross-section Elevation (Feet & X-section ID)

ii) Minimum Change In Cross-section Elevation (Feet & X-section ID)

iii) Average Change In Cross-section Elevation (Feet)

iv) Identify all of the Cross-sections used to calculate the Average Change

15. Comments and Explanations on Permit Review (Identify Item Numbers Related to Any Specific Explanations):

II. ON-SITE REVIEW

1. Identify Coal Seams Within the Permit That Have Been Entirely Mined

2. Identify Coal Seams Within the Permit That Have Been Partially Mined:

3. Identify Current Re-graded Post-mining Topography Features With an "x":

a) Inward Draining Plateau b) Ridge c) Mountain

d) Small Knoll (or Hill) e) Existing Contour Benches

f) Closely Resembles Pre-mining Configuration

4. On Mountaintop Removal Sites - Were the Appropriate Outcrop Barriers Maintained? (Yes, No, N/A, explain if No)

5. Has the PMLU. Been Implemented? (Yes or No)

6. For Operations With the Mountaintop Removal AOC Variances - Is the On-The - Ground PMLU. Consistent With Adjacent Land Uses and Existing Land Use Plans ? (Yes/No, explain if NO)

(NOTE: Answer the Next Five Items UTILIZING THE AVAILABLE ENGINEERING ASSISTANCE)

7. For Operations with the Steep Slope AOC Variance(s) - Do the Permit Area Pre-Mining Slopes Exceed an Average of 20 Degrees ? (Yes/No, explain if No)

8. In Regard to Post Mining Topography:

a) Are There Any Field Measurable Variations in Regraded Land Forms From the Approved Cross-sections? (Yes/No, explain if No)

b) Describe the Regraded Land Form.

9. Identify the Total Number of Fills (constructed and/or under construction).

10. If Available From the Permittee, Provide the Following Information:

a) Bulk or Swell Factor (In percent)

b) Total Overburden Volume (Cubic Yards)

c) Total Fill Volume(s) (Cubic Yards)

d) Identify the Latest Revisions and Amendments to the Actual Earthwork:

11. Compare the Current On-The-Ground Conditions With the Permit Plan Calculations in Section II Item 14. a - f.

12. Comments and Explanations for the On-site Review (Identify Item Numbers related to Any Specific Explanations):

1. The IBLA has since used one of these examples to rule that a postmining increase in elevation due to the swell of spoil material does not constitute a departure from AOC. Pacific Coast Coal Co., Inc, 118 IBLA 83 (1991).


(Home Page)