NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Environmental projects, volume 11. Environmental assessment: Addition to operations building, Mars siteAn Environmental Assessment was performed of the proposed addition to building G-86 at the Mars Site, which will provide space for new electronic equipment to consolidate the Deep Space Network (DSN) support facilities from other Goldstone Deep Space Communication Complex (GDSCC) sites at the Mars Site, and will include a fifth telemetry and command group with its associated link monitor, control processor, and operator consoles. The addition of these facilities will increase the capability of the DSN to support future sophisticated NASA spacecraft missions such as the International Solar and Terrestrial Physics (ISTP) Program. The planned construction of this building addition requires an Environmental Assessment (EA) document that records the existing environmental conditions at the Mars Site, that analyzes the environmental effects that possibly could be expected from the construction and use of the new building addition, and that recommends measures to be taken to mitigate any possible deleterious environmental effects.
Document ID
19900012163
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 6, 2013
Publication Date
February 15, 1990
Subject Category
Environment Pollution
Report/Patent Number
JPL-PUBL-87-4-VOL-11
NASA-CR-186449
NAS 1.26:186449
Accession Number
90N21479
Funding Number(s)
PROJECT: RTOP 314-40-32-10-23
CONTRACT_GRANT: NAS7-918
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available